3 common tunnel radio problems
- 01
Signal fades with distance:Long, enclosed tunnels limit ordinary radio range.
- 02
Many curve/shaft blind spots:Bends, link corridors and shafts become signal dead ends.
- 03
Hard maintenance:Many devices in harsh environments; traditional fault finding is slow.
KINGTONE tunnel solution
Fiber reach distributes signal evenly along the full tunnel.
View productInterference cancellation; same-frequency co-site deployment, saves freq.
View productNo separate uplink/downlink; seamless tunnel/outside handover.
View productRemote monitoring; fault located to the specific remote unit.
View productTypical project parameters
| Parameter | Reference value |
|---|---|
| Coverage length | 1–10 km |
| Topology | Fiber BDA + leaky cable/antenna |
| Terminals | 30–200 units |
| Lead time | 15–45 working days |
Figures above are reference values from comparable projects; final configuration is subject to on-site survey and the contracted technical agreement.
Worked sizing: 3.2 km single-bore, two-lane tunnel
- Scene sizing
- Single-bore two-lane road tunnel, 3.2 km long, roughly 60 m² cross-section. Traffic, maintenance and fire-rescue teams talk inside at the same time and must not cross into each other's groups; both portals must hand over to the existing outdoor radio system.
- Design parameters
- Leaky cable at 2.2 m on the sidewall, remote units every 500 m — 7 remote units and about 6.4 km of cable for 3.2 km. Optical budget at 0.4 dB/km plus 2 dB connector margin, 6-core single-mode backbone, head-end in the portal equipment room. Radiating-cable alternative: directional antennas at 500 m spacing, plus one at each curve and cross-passage.
- Acceptance
- At least 95% of test points at or above −85 dBm with no continuous blind zone longer than 40 m; no dropped call when driving through either portal; speech intelligibility scored at least 4 out of 5; communication holds for at least 180 min on emergency lighting.
- Boundary
- For three-lane bores wider than 80 m², or tunnels longer than 10 km that must also carry video, leaky cable alone is uneconomical — use fiber remote plus distributed antennas. Tunnels with flammable gas require explosion-proof certified models; a standard leaky-cable design cannot simply be reused there.
These are design targets and the calculation method for a comparable project size, not measured results. Final configuration is subject to on-site survey and the contracted technical agreement.