Tunnel & Utility Tunnel Radio Solution

Solves signal attenuation and comms dead zones in long linear spaces: highway/rail tunnels, utility tunnels, subway sections.

3 common tunnel radio problems

  • 01

    Signal fades with distance:Long, enclosed tunnels limit ordinary radio range.

  • 02

    Many curve/shaft blind spots:Bends, link corridors and shafts become signal dead ends.

  • 03

    Hard maintenance:Many devices in harsh environments; traditional fault finding is slow.

KINGTONE tunnel solution

Typical project parameters

ParameterReference value
Coverage length1–10 km
TopologyFiber BDA + leaky cable/antenna
Terminals30–200 units
Lead time15–45 working days

Figures above are reference values from comparable projects; final configuration is subject to on-site survey and the contracted technical agreement.

Worked sizing: 3.2 km single-bore, two-lane tunnel

Scene sizing
Single-bore two-lane road tunnel, 3.2 km long, roughly 60 m² cross-section. Traffic, maintenance and fire-rescue teams talk inside at the same time and must not cross into each other's groups; both portals must hand over to the existing outdoor radio system.
Design parameters
Leaky cable at 2.2 m on the sidewall, remote units every 500 m — 7 remote units and about 6.4 km of cable for 3.2 km. Optical budget at 0.4 dB/km plus 2 dB connector margin, 6-core single-mode backbone, head-end in the portal equipment room. Radiating-cable alternative: directional antennas at 500 m spacing, plus one at each curve and cross-passage.
Acceptance
At least 95% of test points at or above −85 dBm with no continuous blind zone longer than 40 m; no dropped call when driving through either portal; speech intelligibility scored at least 4 out of 5; communication holds for at least 180 min on emergency lighting.
Boundary
For three-lane bores wider than 80 m², or tunnels longer than 10 km that must also carry video, leaky cable alone is uneconomical — use fiber remote plus distributed antennas. Tunnels with flammable gas require explosion-proof certified models; a standard leaky-cable design cannot simply be reused there.

These are design targets and the calculation method for a comparable project size, not measured results. Final configuration is subject to on-site survey and the contracted technical agreement.

CASE FILE

Case brief

A 3.2 km highway tunnel deployed CV120 fiber BDA + CV310 ICS + RS3100 same-frequency repeater + S200 NMS: full-tunnel no-blind-spot radio, maintenance and rescue teams can talk to the tunnel control center anytime.