Services & Support

From site survey to managed O&M — a system delivered once, running for a decade. We write the project scope clearly, so owners understand it and contractors can work with it.

DELIVERY MODEL
Turnkey or alongside your GC
Both models available
Scope split written into the contract
PROJECT WORKFLOW

Six stages from enquiry to operation

Every stage produces a deliverable, not just a conversation

01

Pre-sales consulting & design

We start from requirements: coverage area, department grouping, existing network and budget range. You get architecture options and a preliminary BOM — not a blind quotation.

02

Site survey & layout planning

On-site measurement of structure, obstruction and existing signal levels; output of antenna mounting points, repeater siting and zoning. Survey records issued on the spot.

03

Frequency licensing & system design

Assistance with radio frequency licences and station approval; frequency planning, interference coordination and link budget, resulting in constructible drawings and a configuration list.

04

Supply, installation & commissioning

Own-brand equipment supplied direct, with no middle layer. Installed to drawing, including antenna and feeder works, VSWR and insertion-loss testing.

05

Acceptance & handover documents

Tested item by item against acceptance metrics and archived: as-built drawings, test reports, equipment list, operating manual and training records.

06

Managed O&M & annual maintenance

After handover the system enters its operating phase: preventive maintenance, scheduled inspection, fault response and spare-parts supply — optionally under an annual maintenance contract.

SERVICE CAPABILITIES

Full-chain service, from design to operation

Organised by project stage — each item maps to a deliverable

DESIGN & SURVEY

Design & Survey

Turning "we need radios" into drawings, evidence and a buildable scope

  • Pre-sales consulting & solution design
  • Site survey & coverage measurement
  • Site layout planning & antenna siting
  • Link budget & coverage calculation
  • Frequency planning & interference coordination
  • Support for RF licence & station approval
BUILD & DELIVER

Build & Deliver

Self-delivered or working alongside a general contractor — both work

  • System construction & turnkey delivery
  • Installation, commissioning & cut-over
  • Acceptance testing & project handover
  • As-built documentation & handover package
  • Multi-system interlock & third-party integration
  • System engineering GC & specialist subcontracting
  • ELV engineering & system integration
  • Communication room & equipment-room fit-out
OPERATE & MAINTAIN

Operate & Maintain

Handover is not the finish line — the system must run for a decade

  • Managed O&M & maintenance contracts
  • Preventive maintenance & equipment servicing
  • Scheduled inspection & fault response
  • Spare parts & consumables supply
  • Equipment rental & event support
  • Service network & factory repair support
COMMITMENT

Commitment

Every commitment backed by something a third party can verify

  • After-sales service & warranty policy
  • Vendor technical support & handover
  • Technical training & operator handover
  • Service SLA & response time (graded by contract)
  • Project references & track record
  • Qualifications & system certifications
SCOPE OF WORK

How the scope is split: what we do, what the GC does

The question every contractor and integrator asks first — clear interfaces make smooth collaboration

KINGTONE provides

  • Own-brand equipment supply and warranty
  • Frequency planning, link budget and system design
  • Factory technical support, commissioning guidance and handover
  • Operating procedures and maintenance training
  • Spare-parts supply and factory repair

GC / integrator provides

  • ELV general contracting and on-site construction management
  • Containment, cable tray, comms room and equipment-room works
  • Interlock and retrofit with fire, security and access-control systems
  • Client-side coordination and acceptance organisation
  • Site management for the duration of the project
SERVICE FAQ

Schedule, scope, licensing and acceptance

The questions owners and contractors raise most often before a project starts

How long does a radio coverage project take?

It depends on scale and site conditions. In-building coverage for a single building usually completes within a few weeks including survey, design and commissioning. Multi-building projects requiring fibre runs or frequency licensing are staged. We issue a phased implementation plan after the survey rather than one blanket completion date.

Can we install the system ourselves, or must it be fully outsourced?

Both work. If the client or the general contractor has a construction crew, we supply equipment, technical support and commissioning guidance while the GC manages the site. If a turnkey delivery is preferred, we execute it as the system engineering general contractor. The scope split is written into the contract so there is no argument at the interface.

Does the client have to apply for the frequency licence?

The radio frequency licence and station approval are applied for by the operating entity, but we assist: providing model-approval information, drafting the frequency requirement statement and supporting the technical documentation. Many everyday office and production dispatch handhelds operate on licence-exempt public bands and need no separate approval.

How are faults handled during the warranty period?

Response time is graded by contract. The usual approach: remote triage first, resolving anything the NMS can locate remotely; on-site attendance is scheduled within the agreed time if needed. Spare parts are replaced free of charge within warranty and supplied at list price afterwards. The exact timelines go into the service agreement rather than resting on verbal promises.

What documents are needed for acceptance?

A complete set by project convention: as-built drawings including antenna points and cable routing, coverage field-strength test records, VSWR and insertion-loss test reports, equipment list with serial numbers, operating manual and training attendance records. These are also the basis for final acceptance, settlement and O&M handover.

PROJECT CONSULTATION

A project to deliver? Let's start with the scope

Tell us the site conditions, building scale and preferred delivery model (turnkey or alongside your contractor), and we will come back with a staged implementation plan and a recommended scope split. Integrators and system contractors are welcome to discuss channel cooperation.