SCENE / PORT & LOGISTICS

Port & Logistics Yard Radio Solution

Solves radio black spots behind stacked containers and inside large terminals: distributed fibre BDA and all-optical coverage penetrate steel stacks, while grouped voice and LTE/5G private data keep crane operators, yard drivers and gate control on one dispatch network.

3 common port & yard radio problems

  • 01

    Steel-stack shadowing:Container blocks form moving metal canyons; ground-level handhelds lose the base station behind a stack.

  • 02

    Crane-to-ground coordination:Crane operators and yard drivers need low-latency grouped voice; public-network push-to-talk is unreliable at peak hours.

  • 03

    Vast open area, few landmarks:A terminal of several km² needs many low-power nodes and a backhaul that survives dust, salt and moving machinery.

KINGTONE port & logistics solution

Typical project parameters

ParameterReference value
Coverage area1–10 km² terminal / yard
GroupsCrane / Yard / Gate / Security / Maintenance
Terminals100–800 units
Lead time30–90 working days

Figures above are reference values from comparable projects; final configuration is subject to on-site survey and the contracted technical agreement.

Worked sizing: 2 km² container terminal, 4 cranes

Scene sizing
2 km² terminal with 4 gantry cranes, 6 container stacks and a gate complex; steel stacks change height and position daily.
Design parameters
Fibre BDA nodes placed on light towers and crane rails with 10–20 km optical backhaul; CV410 routes both narrowband voice and LTE/5G data; RS3500 repeaters IP-linked to gate and control; node height set above the maximum expected stack so the shadow zone stays inside the overlap of two neighbours.
Acceptance
Field-strength floor checked at stack canyons, crane cabins and gate lanes at ≤50 m spacing; grouped call setup and push-to-talk latency logged under peak-load conditions; handover verified between adjacent nodes with no dropped dispatch call.
Boundary
Not for vessel-to-shore marine VHF or port-safety regulated systems — use marine/ERTCS-compliant equipment. Where stacks regularly exceed the tallest node, add elevated repeaters rather than raising power alone.

These are design targets and the calculation method for a comparable project size, not measured results. Final configuration is subject to on-site survey and the contracted technical agreement.

CASE FILE

Case brief

A container terminal deployed fibre BDA nodes on light towers and crane rails with RS3500 repeaters IP-linked to the gate: crane operators, yard drivers and gate control each held one group across the whole yard, and the all-optical backbone carried narrowband voice alongside LTE/5G data without adding separate backhaul.

Other scenario solutions

WhatsAppGet a Plan